Is Pricing a Job From Your Daily Rate a Mistake?
A day rate alone hides your drive time, supply runs and extra days. Here is how to build a price from hours, materials and profit, then use the day rate as a sanity check.
By the MagicBuild team ·
Is it a mistake to price a job off my daily rate?
A day rate alone is a risky way to build a price, because it hides your materials, your drive time and how many days the job really takes. It works much better as a check on a price you built from the job itself.
Here is where it leaks. If you quote two days and the job runs four, you ate two days. If the job is four hours, you still lose most of the day to driving and the supply run. And a customer who hears a daily number starts counting days in their head, which invites haggling over every hour instead of looking at the finished result.
A contractor on Reddit said randomly throwing out a price is a terrible way to price a job and that you need to factor in all the drive time, shopping time and chit chat time (Reddit). Most of us learn that the hard way, one thin job at a time.
There is also a mismatch problem. Your day rate says one thing, and your materials and overhead say another. Housecall Pro's free price calculator tells contractors to price off fully loaded labor cost, meaning wages plus payroll taxes, benefits, vehicle, tools, insurance and overhead, not just the hourly wage (Housecall Pro). That is a build-it-up approach, and it is the one that tells you which number to trust.
Here is the two methods side by side:
| Example comparison | Day rate only | Built-up price |
|---|---|---|
| What it is | Days times your day rate | Hours at loaded cost, plus marked-up materials, plus profit |
| When it works | Repeat jobs where you know the days well, and as a final check | Almost any job, especially ones with real materials or an unknown length |
| Where it leaks money | Extra days, drive time and supply runs get eaten; if a four-hour job is billed as half a day, it can use 65% of the day's cost for 50% of the price (Pavado) | Only when your hour estimate is off, which you can fix on the next bid |
| Client perception | Client counts days and haggles over each one | Client sees one price for a finished result |
| How to sanity-check | Compare to what similar jobs really cost you | Convert hours to days and compare to your day rate |
| Mini-example (made-up numbers) | Say you quote 2 days at a $640 day rate for $1,280 and the job runs 3 days, so you worked a day for free | Say 12 hours at $60 loaded cost, $480 of marked-up materials and 15% profit comes to $1,380 |
Why does a short job lose money when I charge a full day rate?
Because a short job costs more than its share of the day: the driving, loading and supply run don't shrink when the job does. If you bill a four-hour job at half a day, you are billing less than it costs you.
If you bill a four-hour job as half a day, it might consume 65% of the day's cost while billing 50% of the day's price, and the gap comes out of margin on every short job you accept (Pavado). If you wonder whose numbers those are, the 65% and 50% figures are cited from Pavado's crew pricing guide, not from my own jobs. The same thing happens to a solo contractor, just with one person's day instead of a crew's.
Three fixes that work:
- Set a minimum charge for any visit that covers the trip, loading and the supply run before you swing a hammer.
- Price short jobs by hours plus a fixed trip charge, not as a fraction of a day.
- Bundle small tasks at the same address into one visit when you can.
How do I price a job from hours, materials and profit instead?
Add up every hour the job takes at your fully loaded hourly cost, add materials with a markup, then add profit on top. The total is your price, and the day rate comes in later as a check.
Start with your hourly cost. If a solo tradesperson wants $70,000 in pay, carries $30,000 of overhead and bills 1,200 hours a year, they break even at about $83 an hour and should bill around $96 with a 15 percent profit margin on top (Numulo). Notice that 1,200 billable hours is not a full work year, because quoting, driving and paperwork don't get billed. Plug in your own pay, overhead and billable hours, not those numbers.
Then build the job in this order:
- List every task and give it hours, including driving, the supply run and cleanup.
- Multiply total hours by your loaded hourly cost.
- Add materials at your cost, then your markup.
- Add profit on top of the subtotal.
- Round to a clean number and write it on the estimate.
Say a gate install has $400 in materials, 12 total hours (10 on site plus 2 for driving and the supply run), a loaded cost of $60 an hour, a 20% materials markup and 15% profit on top:
| Example line | Amount | How it is figured |
|---|---|---|
| Labor, 12 hours | $720 | 12 hours at $60 loaded cost |
| Materials | $480 | $400 cost plus 20% markup |
| Subtotal | $1,200 | Labor plus materials |
| Profit | $180 | 15% of the subtotal |
| Price to quote | $1,380 | Subtotal plus profit |
The last row is the number you quote. You can run your own jobs through the free job cost calculator to see the same breakdown.
How much should I mark up materials?
Mark materials up enough to cover the time you spend buying and hauling them, waste, returns and a little profit. There is no single right percentage, and I don't have good data to hand you a typical one.
What the markup pays for is easy to list: the supply run, the extra cut that becomes scrap, the wrong part you return, and carrying the cost until the customer pays. If you fund materials out of your own pocket, that last one is real money.
To find your number, pull the receipts from your last five jobs and note the extra trips, the returns and the leftovers you couldn't use. Then pick a percentage that would have covered them. For example, if you buy $1,000 of lumber and your markup is 20%, you bill $1,200 for it.
Whether you show the markup as its own line or roll it into the material price is your call. Just keep it consistent from job to job so your bids don't drift.
How do I count drive time, supply runs and drying or wait time in my price?
Write each of them down as hours on your estimate worksheet, the same way you count hours on site, and price them at the same loaded rate. If it takes your time, it belongs in the price.
Use this checklist on every bid:
- Drive to the site and back, including the visit to measure.
- The supply run, including parking, finding the part and standing in line.
- Loading, unloading and cleanup at the end of the day.
- Talking with the customer, which is part of the job whether or not you enjoy it.
- Waiting on drying, curing or an inspection.
If a contractor charges a $650 day rate and gives the client a range of days, a reply on that thread worked out the hourly labor cost at $67.50 an hour, assuming 12 hours, and warned that programs don't usually pro rate time correctly, so you need to audit the time frames and add in breaks for drying (Reddit). Whatever tool you use, check its hours against how the job actually runs.
Waiting is tricky because you may not be working but you also can't start the next job. Either schedule other work into those gaps, or put a line in the price for the days you are tied up.
How do I use my day rate to double-check a bid?
Convert your built-up price into days and compare it to your day rate. If the two are far apart, find out which number is wrong before you send the bid.
Divide the job's labor hours by the hours in your working day to get the number of days. Multiply by your day rate, add the marked-up materials, and compare the total to your built price.
Say the gate job above has a $640 day rate for 8 hours, so about $80 an hour. If you price the 12 hours at that rate you get $960, and if you add $480 of marked-up materials the total is $1,440, which is about 4% above the $1,380 built price. That is close enough to trust both numbers.
If the day rate check comes out far higher than your built price, your hours or hourly cost may be low. If it comes out far lower, your day rate may be too low, or your bid may be padded and could cost you the job.
The same check works after the job. Compare the hours you estimated to the hours you actually spent, and compare what you billed to what the job cost you. If you are new and can't tell whether you undercharged or are just pricey, those after-the-job numbers will tell you faster than guessing. In MagicBuild you can see job profit on each project, with receipts filed to the job, so you don't need a spreadsheet for it.
Try it on your next bid
Pick one job you are about to quote and build the price from hours, marked-up materials and profit, then check it against your day rate. If you want help, Magic, the AI assistant in MagicBuild, can build an estimate from a photo and a description at your own prices, and your client can sign on their phone.
See what MagicBuild does or start a free trial for 14 days, or use the free job cost calculator first.
Sources
- Field Service Price Calculator | Free Job Pricing Tool · housecallpro.com
- Labor Rate Calculator for Trades | Numulo · numulo.com
- How Much to Charge Per Day for a Crew: $704/Man | Pavado · pavadotech.com
- How do you guys charge labor? (Reddit r/Contractor) · reddit.com
- Did I badly undercharge on this job? (Reddit r/Contractor) · reddit.com